Keywords : environment, truck loading crane, soil survey, geologist, survey holes, grapner, bucket grab, grapples, geotechnician
Task:
On request of a geological engineer, execution of 2 survey holes at a depth of 6 - 7 meters on development property. Because of the coming winter, a fast solution is required, to confirm feasibility of the construction project.
With the Grapner, the survey holes are executed in less than one day, with one person and a loading crane.
Advantages: